Skip to content

Project Management

Registration

The documentation must be submitted at the registry or Single Entry Point of the Alicante Institute for Health and Biomedical Research (ISABIAL).

Documents to be submitted

  • Preferably in PDF via email
  • In person, submitted on paper, USB, or CD at the ISABIAL headquarters
  • Documents requiring it must include the version number, date, and signature

Submit only the documents indicated in the table below

Internal projectPROYECTO INTERNO

When the Principal Investigator belongs to an ISABIAL Research Group and/or a Health Department (DS), and the project is managed through ISABIAL

Project Application and Project Report (ISABIAL standard format, if no specific template is available)
Curriculum Vitae of researchers (PI and collaborators) (ISABIAL standard format; CVA or CVN formats are also accepted)
Approval from the service supervisor (PI and collaborators) (ISABIAL standard form)
Other documents of interest for requesting the CEIM Opinion:
Recommendations for preparing the HIP
Template to be followed for the preparation of the HIP
IC template
IC template for legal representative
Oral IC template before witnesses
HIP Template for projects with surplus material stored in the Biobank
IC Template for projects with surplus material in the Biobank
Recommendations for the exemption of informed consent
Annex IV.1 Request for Informed Consent Exemption
Annex IV.2 Investigator’s declaration requesting IC waiver
Recommendations for submission to the CEIm
EXTERNAL PROJECT – without CEIM

When the PI is external and a collaborating researcher of the Foundation or the Health Department (DS), and ISABIAL does not manage the project

Solicitud
Project Report (format used by the PI; it must include the activities to be carried out at ISABIAL / DS)
CEI / CEEBA Opinion from the PI’s institution (format used by the PI’s institution)
Approval from the service supervisor (Collaborating Researchers) for external collaborations (ISABIAL standard form)
Recommendations for submission to the CEIm
External project -with external -CEIM

When the PI is external and a collaborating researcher of the Foundation or the Health Department (DS), and ISABIAL does not manage the project

Project Report (including the financial report and, where applicable, the list of participating centers in the project indicating the involvement of HGUA; the format used by the PI must include the activities to be carried out at ISABIAL / DS)
External CEI Opinion (format used by the PI’s institution)
Approval from the service supervisor (Collaborating Researchers) for external collaborations (ISABIAL standard form)

Contact

(1) Registration – Gateway
Ana Obispo 965 913 948
info@isabial.es

(2) Projects
Carles Blasco 965 913 941
Miguel Tirado 965 913 985
Pablo Flores 965 913 999
Raquel Molina
proyectos@isabial.es

(3) International
Óscar Elía 965 913 986
internacional@isabial.es

Location

(1) 1st Floor Modular Offices (in front of the IT Department)
Dr. Balmis University General Hospital A
vda. Pintor Baeza, 12, 03010 Alicante

(2)(3) Ground Floor Modular Offices (in front of the IT Department)
Dr. Balmis University General Hospital
Avda. Pintor Baeza, 12, 03010 Alicante

Hours

Monday to Friday
9:00 AM to 2:30 PM

Back To Top
No results found...